Search
Close this search box.
Search
Close this search box.
Search
Close this search box.

Installing Duffel Top Bulk Bag Filler

BagPak 1100-DT

Assembly of this duffel top bulk bag filling frame is very easy and can be completed by two people in less than 15 to 20 minutes.

After removing the shipping straps, set the upright aside, and the base can be set on the floor. Make sure the retention bolts are sufficiently clear from the receiving tubes and the upright section can now be lifted and placed into the rear of the base. Firmly tighten the bolts to secure the upright.

The holder arms can now be lifted up and over the uprights and secured via the hitch pins. These arms are asymmetrical and you will want to make sure that the horizontal tubes of each arm index to the outside of the uprights for proper spacing.

The rule of thumb is to have the bag suspended so that the corners are approximately three to four inches up from the pallet, allowing the bag to stretch properly without any folds or leaning. Readjustment is easily accomplished by removing the hitch pin while holding the arm, adjusting to the desired height, then replacing the hitch and safety pins for each arm. Recheck for proper height.

The bag is now ready for filling. See our operations video for more information on how this is done.

Please contact your FormPak representative for more information on this or other FormPak products.